© 2024 MICHIGAN PUBLIC
91.7 Ann Arbor/Detroit 104.1 Grand Rapids 91.3 Port Huron 89.7 Lansing 91.1 Flint
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Poe Shipping Lock closes temporarily for repair work

The Herbert C. Jackson prepares to enter the MacArthur Lock while the Tuscarora approaches the Poe Lock pier.
Michelle Hill
/
U.S. Army Corps of Engineers

A shipping lock that enables cargo vessels to move between Lake Huron and Lake Superior has closed temporarily for repairs.

Beverly McCready of the U.S. Army Corps of Engineers says the Poe Lock in Sault Ste. Marie, Michigan, was closed around 8 a.m. EDT Monday and is expected to reopen at 6:30 p.m.

She says concrete has eroded on a sill beneath one of the lock's gates. Crews are installing concrete and steel plates as a stopgap measure and will do a complete fix this winter.

The Poe Lock is the only one of the Soo Locks that's big enough for large vessels that carry iron ore used in steel manufacturing.

Construction of a second large lock is expected to begin next year at a cost of nearly $1 billion.

The Associated Press is an independent global news organization dedicated to factual reporting.
Related Content